Only if written into the quotation · Inspections

Quality inspection: added to a supply when you ask for it.

A third-party quality inspection checks goods at the factory against the approved sample, the specification and agreed acceptance criteria. On a Sourcing Lab USA supply, an inspection is coordinated when it is written into the quotation, with its stage, scope and criteria. It is not assumed on every order, and the inspection firm, not Sourcing Lab USA, performs and signs it.

Production follow-up against the approved sample is part of every supply. A third-party inspection is an addition: worth it when the order value, the product or the buyer’s requirements justify an independent check before the final payment.

Page updated 2026-10-26

Share your project brief

SCOPE OF A SUPPLY

What a supply includes.

Included in a supply

  • Product brief
  • Factory search
  • Pricing
  • Samples
  • Order and production follow-up

Only if written into the quotation

  • Third-party inspection
  • Lab testing
  • HS code classification
  • Landed-cost model

Outside our scope

  • Customs clearance
  • Freight forwarding
  • U.S. storage
  • A U.S. company formed for you

We are not a freight forwarder, a customs broker or an importer. Transport, insurance and U.S. entry are named in your quotation, or stay on your side.

DESIGNED AROUND THE PRODUCT

When an inspection is worth adding.

A factory’s own quality team reports to the factory. A third-party inspector reports to the buyer and checks a random sample of the goods against criteria agreed in advance. Where the goods are supplied by Sourcing Lab USA itself, an inspection written into the quotation is a checkpoint on your behalf, carried out by the appointed firm, and is not presented as an independent audit of our own supply.

01

Before shipment (PSI)

Carried out when production is finished and most of it is packed. The inspector draws a random sample and checks appearance, dimensions, function and packaging against the agreed criteria.

02

During production (DUPRO)

Carried out early in the run, to catch a material, tooling or assembly problem while it can still be corrected.

03

Acceptance criteria

Sampling follows tables such as ISO 2859-1. The acceptable defect levels are set per product, per defect severity and per risk, and written into the quotation.

04

Lab tests

Where a product needs a test, such as a material or safety test, it is done by the laboratory you or the quotation names. Tests are added the same way as inspections: only when written into the quotation.

A DOCUMENTED PROCESS

How an inspection is added to a supply.

  1. 01

    Written into the quotation

    The quotation states the inspection stage, its scope and who performs it.

  2. 02

    Checklist agreed

    The checklist and acceptance criteria are agreed with you before the inspection, against the approved sample.

  3. 03

    Inspection

    The appointed inspection firm checks a random sample at the factory and issues its report.

  4. 04

    Report and next step

    You receive the report. Where the quotation ties the final balance to the report, the balance follows the result.

Review the product specifications, sample requirements, quantities, product pricing and payment terms before approving your order. Delivery and import responsibilities are agreed for each project. See how product supply and order terms work. Use the supplier evidence matrix and quality checkpoint worksheet to prepare the questions for your order.

Ready to discuss your project? Send the brief: the answer states what can be quoted and sampled, and what cannot.

Share your project brief

QUESTIONS, ANSWERED

Questions about quality inspection on request.

Is an inspection included on every order?

No. Production is followed against the approved sample on every supply. A third-party inspection is added when it is written into the quotation, with its stage, scope and criteria.

How are acceptable defect levels set?

They are set per product, per defect severity and per risk, and stated in the quotation. No single sampling level applies to every product or every order.

When is the best time to inspect?

Early in production to catch a systemic problem while it can still be corrected, and before shipment to check the finished, packed goods. Many orders need only the second; complex or high-value orders may justify both.

What happens if an inspection fails?

The report says what failed and why. Rework, replacement and re-inspection follow the terms written into your quotation and contract.

Why not rely on the factory’s own quality team?

Because it reports to the factory, which wants to ship on time. A third-party inspector reports to the buyer and checks against criteria agreed in advance.

Start with your brief

Send your product brief.

Tell us the product and whether you want an inspection written into the quotation. We confirm what can be quoted and sampled.

  1. 01

    We read the brief

    We confirm what can be quoted and sampled for your product.

  2. 02

    We reply by email

    With the missing information we need, or the next step for the project.

  3. 03

    You get concrete options

    Supplier options, pricing, sampling, and production timing for your review.

Or contact us directly

The more specific the brief, the more precise the first answer. You can also send details later.

Add project details (optional)

Your brief is used only to answer your request. No newsletter, no sales sequence. How we handle your details