Packaging
Structure, board or material, inserts, print and finish. A blank structural sample checks the fit before a printed sample checks the artwork.
Product development · Specification to sample
For Sourcing Lab USA, product development means turning your specification into an approved sample with a factory in China, then supplying the order. It covers custom packaging and textiles: structure, materials, construction, print and finish, through rounds of samples. Products that need new molds or engineered parts are reviewed for feasibility first. Design, engineering drawings and certification stay with you or the specialists you appoint.
A new product rarely works on the first sample. What shortens the rounds is a specification that says what must not change, what can, and how the sample will be judged.
Page updated 2026-10-26
Share your project brief
SCOPE OF A SUPPLY
We are not a freight forwarder, a customs broker or an importer. Transport, insurance and U.S. entry are named in your quotation, or stay on your side.
DESIGNED AROUND THE PRODUCT
Development ends when you approve a sample that the factory can repeat at your quantity and price. That sample, with the written specification, becomes the reference for production. Each revision is recorded, so the approved version is never in doubt.
Structure, board or material, inserts, print and finish. A blank structural sample checks the fit before a printed sample checks the artwork.
Tech pack, fabric, lab dips, fit sample and size set. Each approval narrows what the next sample has to prove.
Cutting dies, printing plates or molds have a cost and an owner. Both, and where the tooling is kept, are written into the quotation before anything is paid.
Where a product needs a test, it is done by the laboratory named in the quotation, when written into it.
A DOCUMENTED PROCESS
We review your specification and say what is missing before a factory is asked to sample.
The factory makes a first sample; you review it against the specification.
Each revision is recorded, with what changed and why.
The sample you approve becomes the reference for production.
The order is quoted and supplied, with production followed against the approved sample.
Review the product specifications, sample requirements, quantities, product pricing and payment terms before approving your order. Delivery and import responsibilities are agreed for each project. See how product supply and order terms work. Use the supplier evidence matrix and quality checkpoint worksheet to prepare the questions for your order.
Ready to discuss your project? Send the brief: the answer states what can be quoted and sampled, and what cannot.
QUESTIONS, ANSWERED
No. We work from your specification, tech pack or drawings, and say what is missing for a factory to sample it. Design and engineering drawings stay with you or the designer you appoint.
It depends on the terms, which is why tooling cost, ownership and where it is kept are written into the quotation before anything is paid.
It depends on how complete the specification is and how new the product is. A clear specification with a reference sample often needs fewer rounds; a new construction usually needs more.
Through the written terms of the supply and, where needed, an agreement drafted by your own counsel. We do not provide legal advice.
OEM means the product is made to your own design. ODM means a factory’s existing design is adapted and sold under your brand.
Start with your brief
Specification or tech pack, references, quantity and target date. We confirm what can be sampled and quoted.
We confirm what can be quoted and sampled for your product.
With the missing information we need, or the next step for the project.
Supplier options, pricing, sampling, and production timing for your review.
Or contact us directly